Requirements first

Requirements first, production second.

Four groups of inputs are reviewed before any modeling begins.

Anything missing is logged in the requirements register, never assumed.

The workflow

Six stages. Six records.

Select a stage to see its checks and the record it produces.

Requirements register
Setup checks
Production review
Issue register
QC record
Release record
STAGE 01 OF 06

Requirements

Scope, standards and inputs are agreed and anything missing is logged before production.

Checks

  • Scope confirmed
  • Standards identified
  • Missing information logged

Record produced

Requirements register

The modeler may perform the first check. Final release requires a separate review.

QA/QC system

Structured checks. Documented review. Repeatable quality.

Every review combines your project-specific requirements with ADES baseline quality checks. Select an area to see what is checked.

Review methods

Automated: rule-based checksVisual / technical: professional reviewProject-specific: client and BEP requirements

Review status

PassFailOpenN/AException

Pass: requirement satisfied. Fail: correction required. Open: pending action or information. N/A: not applicable. Exception: reviewed deviation.

SAMPLEExample statuses, not project results
Sample BIM delivery checklist
CategoryCheckMethodStatus
SetupShared coordinates verifiedVisualPass
MechanicalEquipment access verifiedTechnicalPass
ElectricalPanel working clearance checkedTechnicalPass
PlumbingRequired pipe slopes verifiedTechnicalPass
CoordinationMajor hard clashes reviewedCoordinationOpen
DocumentationView naming meets standardVisualPass

Automated validation

Automate the deterministic. Review what requires judgment.

Rule-based Revit and Dynamo workflows support repetitive QA/QC checks, so technical reviewers can focus on decisions that need professional judgment.

Revit modelAutomated validationFlagged conditionsTechnical reviewQA/QC record

What can be rule-based

  • Naming, parameters and potential duplicates
  • Model structure, defined geometry and required data

What remains human-reviewed

  • Constructability and equipment serviceability
  • Routing practicality, design intent and accepted exceptions

Issue control and release

Identify. Resolve. Verify. Release.

Coordination and quality issues are recorded, assigned, reviewed through closure, and reflected in the deliverable's release status.

01

Identified

QA/QC, validation or review

02

Classified

Type, priority and action

03

Assigned

Owner, reference, review point

04

Corrected

Model or information updated

05

Rechecked

Correction verified

06

Closed

Closure or accepted exception

Items that fail the recheck return to Corrected. Further action is required before they can close.

CriticalBlocks releaseMajorMaterial coordination or accuracy issueMinorNon-critical quality issue

Corrected does not mean closed.

Release conditions

  • No unresolved critical issue
  • Required QC completed
  • Outstanding major items assessed and documented
  • Accepted exceptions recorded
  • Current package and revision identified
  • Reviewer approval recorded
Sample delivery release record
FieldRecord
Project / package—
Package ID / revision—
Submission date—
QC reviewTo be recorded
Open items / exceptionsTo be recorded
Prepared by / reviewed by—
SAMPLEExample statuses, not project results
Sample coordination issue register
IDDisciplineIssuePriorityOwnerStatus
CI-021MechanicalDuct / beam conflictMajorADESClosed
CI-022PlumbingDrain slope conflictMajorADESRecheck
CI-023ElectricalPanel clearanceMajorClient / GCOpen
CI-024MechanicalAccess-zone reviewMinorADESClosed
CI-025CoordinationPenetration pendingMajorDesign teamOpen
CI-026ModelView namingMinorADESException
No deliverable moves directly from production to the client.