Construction-Phase Model Management and Clash Resolution for a New Rail Power Substation
Keeping the model in lockstep with construction
Project: Rail Power Substation · Construction-stage coordination · Harrison, NJ

Summary
A new two-story rail power substation required a model that stayed current throughout construction. Prashant maintained the multidisciplinary model against site progress and used Navisworks clash detection to resolve conflicts ahead of installation.
- Type
- Construction-stage coordination
- Location
- Harrison, NJ
Core challenge
Model currency had to be maintained throughout an active construction phase
Architectural, structural and MEP updates needed to progress in parallel with site works
Unresolved cross-discipline clashes risked rework during installation
Our solution
- 01
Progress-aligned model updates
Updated architectural, structural and MEP elements to reflect construction progress.
- 02
Navisworks clash detection
Ran systematic cross-discipline clash detection.
- 03
Collaborative clash resolution
Revised the models with the project team to resolve identified clashes.
Business outcome
maintained in step with construction progress
in Navisworks, from detection to model revision
modeled and kept current through construction