Summary
A wastewater treatment facility required an accurate representation of its aeration building ahead of a system upgrade. Prashant led the multidisciplinary scan-to-BIM effort, establishing a validated architectural, structural and MEP baseline from point cloud data.
- Type
- Scan-to-BIM
- Location
- Staten Island, NY
Core challenge
Upgrade design decisions hinged on reliable existing-conditions data
Architectural, structural and MEP information had to be reconciled against the scan and across disciplines
Latent conflicts between existing elements posed a risk to downstream design if left unidentified
Our solution
- 01
Multidisciplinary delivery leadership
Directed the modeling effort as Project Lead, aligning scope, standards and quality across three disciplines.
- 02
Point-cloud-driven modeling
Oversaw the development of architectural, structural and MEP models directly from point cloud data.
- 03
Accuracy validation
Verified modeled existing elements against captured site conditions.
- 04
Early conflict identification
Ran cross-discipline clash detection ahead of design decisions.
Business outcome
consolidated into one validated existing-conditions baseline
applied before design: accuracy validation and clash detection
led end to end: team leadership, modeling, accuracy validation and clash detection
Similar case studies
Get started
Start small. Prove the fit. Then scale.
Begin with one equipment room model or one coordination review cycle, scoped and priced up front.





